Home / Processing and raw material

Seed processing line

Processing services

Raw material processing
on our own lines

Cleaning, calibration, colour sorting, roasting and packing. We work on a tolling basis and separately buy raw material from farmers and traders.

The two forms reach different people, so nobody bounces you between departments

  • 3tonnes per day
  • 100+tonnes of storage
  • 00minutes analysis
  • 7operations on the line

Numbers, not talk about modern equipment

What we do and how much we run

Capacity in tonnes per day, so you can see straight away whether your volume fits.

OperationSectionDetails
Cleaningcleaning linefrom debris, husk and foreign matter
Calibrationcleaning linesplit into fractions for the task
Separationcleaning lineseparation by density
Roasting and saltingproduction3 tonnes per day, our own profiles
Packingproductionformats 30–220 g
Storagewarehousefrom 100 tonnes, big bags and sacks

So you can see whether we can handle your volume before the first call

Tolling

How tolling works

Your raw material stays yours. We charge for the work, not for the goods.

01

Minimum order

3,700 kg sunflower on the cleaning line, from 3 tonnes of seeds and from 2 tonnes of peanuts in production

02

Pricing

Per tonne, per operation or per line hour.

03

Time from intake to release

3–7 days, depending on whether the raw material needs cleaning and calibration

04

Storage

3 days free of charge, longer by agreement

Intake

Arrive, weigh in, unload

24hours the weighbridge runs
Weighbridge on site Lab at the gate GPS coordinates for the driver

So you do not have to block a whole day for unloading. Address and hours go up once Epic Foods confirms them

Raw material buying

What we buy

If you are a farmer or a trader, here are the requirements and monthly volumes. Leave your offer below.

CropRequirementsVolume per month
Confectionery sunflowerincluding striped, and sunflower kernel00 t
Pumpkin seedswe buy00 t
Peanutsparameters00 t

Requests

Different people, different questions

The left form goes to production, the right one to procurement. That way the person who decides is the one who answers.

Processing request production

Which operations you need

Raw material offer procurement

We reply within one working day. Your details are not shared with third parties.